This will be the stage area for the little ones

MARCH HAPPENINGS

Currently, we are in the demolition and construction phase.  However, we have begun the wood floor isntallation process and custom-made shelves and the stage will be installed shortly after. The school is located at: 22679 Sampson Drive, Chugiak, Alaska 99567

Ozzy preparing the subfloor for hardwood installation

The double doors in the background will give the toddler classroom plenty of natural lighting

Phase 3 of wood floor installation in progress

The hardwood flooring material will add a classy look to the toddler classroom

Half way done

Finishing the Toddler classroom. The hardwood is beautiful!

Looking at the finished product from another angle

Looking at the toddler stage from the right side

This will be a corner bench in the toddler classroom.